sport and recreation |
|
Sport and Recreation Centre |
|
![]() |
|
| The Centre was built during the seventies. By renewing the
entrance and the secundary spaces a new lay-out for the 3 halls is created. One of the extensions is a concervatory with a 2.7 kWp PV facade. For the hot water supply, a 18 m2 thermal solar system is installed. |
|
![]() |
![]() |
The design is based on the idea to integrate environmental
technological aspects, such as using solar energy, into the building in
such a way that they help create a special atmosphere. |
|
![]() |
![]() |
Design: Guus Westgeest Architecten Valkenburg (ZH) |
|
Our client is: Community of Valkenburg (ZH) |
|